Track Operator Time

The Time Log tracks actual operator time against a specific operation. It is useful for labor costing and for sharpening the OEE Performance figure.

Clock time against an operation​

  1. Open Manufacturing Planning → Work Orders, open a work order and go to Details. The Time Log card lists its operations.
  2. Clock In on an operation, optionally picking an operator and workstation.
  3. Use Pause for breaks so they do not count against efficiency, then Resume.
  4. Clock Out to end the log. Actual minutes are the clocked time minus paused time.

The card shows standard against actual minutes and an efficiency figure per operation.

:::info You do not need to remember to clock out Complete work order clocks out any log still running. This posts no labor journal by itself. :::

Apply time-log labor to cost​

Optionally, turn on Apply time-log labor on completion in Manufacturing Settings → Company Settings. Completing a production entry then adds unapplied time (net minutes times the workstation hourly rate) to that entry's labor cost, posted by the usual labor journal.

  • A later entry adds only the new minutes.
  • A workstation with a zero hourly rate is left unapplied.
  • Minutes logged after the last entry wait for the next one.
  • If the Direct Labor or WIP account is missing, stock still completes and the screen warns that labor was not applied.