Running a Work Order from Start to Finish
A work order is the shop-floor job: what to make, how many, and which recipe (BOM) to use. This article is the short version; Create and run a work order has every status and rule.
The lifecycle
Draft → Released → In Progress → Completed → Closed
1. Create the work order
- Go to Manufacturing Planning → Work Orders → Create.
- Select the finished item, an Active BOM, the quantity and target dates.
- Save. The order is a Draft and loads its components from the BOM.
2. Release it
Click Release. This checks that the BOM has lines and unlocks material issuing.
3. Issue materials
From the work order's Details, click Issue materials for a pre-filled material issue. Posting it reduces raw stock at the source warehouse.
4. Record production
Use Report production to log good, rejected, rework and scrap quantities. Completing the entry increases finished goods stock.
:::tip Prefer fast, real-time capture? The Shop Floor Terminal lets operators tap Good, Reject, Rework and Scrap from any browser and rolls everything into one production entry when the session completes. :::
5. Complete and close
Click Complete work order once output is done, then Close order to finalize. Closing is final.
If something goes wrong
- Pause: use Put On Hold, then Resume.
- Cancel: needs a reason, returns issued materials to stock and reverses their journals. It is not possible once production entries are completed.
Related articles
Learn more about Biznsbook Manufacturing on biznsbook.com.