Skip to main content

Optimize Warehouse Networks

Enterprise Supply Chain Optimization adds warehouse networks and network safety-stock optimization, so you can pool risk across sites and move stock before buying more. See Warehouse overview and Transfer stock between warehouses.

Build a warehouse network​

  1. Go to Network Optimization → Warehouse Networks, enter a name and click Create network.
  2. Open the network. Under Add node, enter the Warehouse ID, leave Parent node ID empty for the first (root) node, and enter Transit LT days and Processing days. Add child nodes by giving each the ID of its parent node.
  3. Use Remove on a node with no children if you need to change the layout.

The network must be a tree: one root, each warehouse with exactly one parent, and no loops. Invalid changes are refused with the reason. A typical pattern is a central distribution center with regional children.

Optimize and action transfers​

  1. Go to Network Optimization → Network Optimization.
  2. Click Run network optimization now for a network (this can take a moment), or Run two-level pooling for item for one item.
  3. Read the Recent runs table. The Mode label shows what produced the numbers: General network solver, Two-level network pooling, or a Fallback (non-tree network, or solver unavailable).
  4. In Transfer recommendations, click Create transfer to create a draft stock transfer from the central warehouse to a regional one, or Dismiss.

If the central warehouse cannot cover a shortfall, a purchase suggestion is created instead under Inventory Optimization → Suggestions. If the advanced solver is unavailable, two-level networks still run with pooling, while deeper networks raise an exception and wait. A weekly job runs every active network automatically.

Items with an active DDMRP decoupling point are excluded from network and Tier 1 optimization so the engines never give conflicting advice. See Use DDMRP buffers.

:::tip Pilot first Start with one network and a small item set, and practice Action on a transfer before relying on the weekly run. :::

Next step​